efficiency PACK
eP 150.200

The larger industrial ORC frame. It turns around 2 MW of thermal waste heat per module into up to 200 kW of electricity — no additional fuel — and arrives plug-ready in a 40-foot container with the cooling already integrated.

ORC · Industry & Power efficiency PACK eP 150.200 module Typical heavy-industry installation Industrial stack — waste heat source

Same Organic Rankine Cycle technology as the eP 050.100 — sized up for the largest continuous heat streams on a site.

The module takes low-grade heat your process already produces and converts it into electricity, with no extra fuel and no extra combustion emissions. Delivered ready to connect in a 40-foot container with the cooling built in, it is commissioned in days rather than weeks.

Brio Energy is the official India partner of Orcan Energy — covering supply, integration, commissioning and ongoing service.

Key benefits

  • Most power per module — up to 200 kW electrical from a single frame.
  • No extra fuel — runs entirely on heat the process is already producing.
  • Plug-ready — arrives in a 40-ft container with cooling integrated.
  • Lower CO₂ — clean electricity that displaces grid or diesel power.
Facts & figures — eP 150.200
ApplicationsIndustry & Power
Input power~2 MWth per module
Electrical outputUp to 200 kWel
Heat sourcesFluid above 80 °C; gaseous above 150 °C
Dimensions (W × L × H)12.2 m × 2.5 m × 2.9 m (40-ft container)
CoolingIntegrated in the container
ManufacturerOrcan Energy AG — India partner Brio Energy Pvt. Ltd.

Figures as published by the manufacturer. Site-specific output is confirmed by a site survey.

The eP 150.200 suits the highest-volume, continuous heat sources — the same sectors as the smaller frame, at a larger scale.

01

Cement

Kiln and clinker-cooler exhaust as a continuous, high-volume heat source.

02

Steel

Reheating furnaces and engine halls running around the clock.

03

Glass

Melting-furnace waste heat recovered without disturbing the process.

04

Oil & Gas

Engine and compressor exhaust at on-site facilities.

How is this different from the eP 050.100?
Same ORC technology, larger frame. The eP 050.100 handles 500–1,200 kW thermal per module; the eP 150.200 steps up to around 2 MW thermal and up to 200 kW electrical.
Does it burn any fuel?
No. It converts heat your process already produces into electricity — no additional fuel and no additional combustion emissions.
How much space does it need?
It comes in a 40-foot container (12.2 × 2.5 × 2.9 m) with the cooling integrated, so the footprint is predictable and installation is quick.
Who installs and services it in India?
Brio Energy Pvt. Ltd., as Orcan Energy's official India partner — covering supply, integration, commissioning and service.
Also in this range

Other efficiency PACK frames

Industry & Power efficiency PACK eP 050.100

efficiency PACK eP 050.100

The industrial frame for smaller heat streams — 500–1,200 kW thermal per module.

  • Input power500–1,200 kWth
View product →
Marine efficiency PACK eP M 150.200

efficiency PACK eP M 150.200

Marine frame for larger ship engines — new-build and retrofit.

  • Input power1,000–2,100 kWth
View product →
Marine efficiency PACK eP M 050.100

efficiency PACK eP M 050.100

The compact marine frame — for example a 1 MW engine.

  • Input power560–1,100 kWth
View product →
Request a quote

Measure first.
Then buy the module.

Before any capex decision we size the recovery on your site and put a rupee figure and a payback period against it.